New hot metal working machine installations
Supply and construction of hydraulic, pneumatic lubrication and process cooling systems
A new recent intervention involved the Idraulica Pedroncelli team at the request of a leading company in the lower Valtellina operating in the steel machining sector, which needed a professional installation in the shortest possible time of service facilities for a machine that has just been placed on their production site.
Timeliness, speed of execution, efficiency these are the requirements of the work entrusted to us.
New installations for industrial machinery: the intervention in detail
The project revolved around a newly installed hot metal working machine for whose use it was necessary to realise the hydraulic, lubrication and process cooling systems as well as thepneumatic system. The intervention carried out by Idraulica Pedroncelli, after an inspection and careful planning, consisted of the following works:
- laying in the caves of all pipe supports heavy series;
- construction of main hydraulic lines with SCH 160 piping in diameters 76.1 - 60.3 mm, by TIG welding for a total of 83 metres;
- construction of main hydraulic lines with hydraulic piping in diameters 38×5 - 30×3 - 20×2.5 mm, with connections made by cold deformation with Walform machine for a total of 630 metres;
- construction of pneumatic lines with aluminium piping in diameters 63 and 32 mm, complete with all fittings for a total of 78 metres;
- construction of process cooling lines by TIG and electrode welding;
- final inspection of the equipment and the machine.
Objectives and Achievements
Idraulica Pedroncelli dedicated a total of 6 specialised resources divided into two teams in order to achieve the objective and complete the work in the shortest possible time as requested by the client. Thanks to the commitment of our professionals, the project was completed in 25 working days. This allowed us to avoid overlapping with other companies involved in the construction site.
The end result also fully complied with the high standards of quality and efficiency set at the beginning of the project, demonstrating to the customer our great reliability, experience, excellence in the materials supplied and the value of our workers.